dusk bot
routinestrello overdue cards

dusk botroutines

pull overdue trello cards into the morning standup

bring the overdue card to standup with the name of someone who can explain it. this routine reads one trello board before the meeting.

by the dusk bot team · checked · how we made this

it skips finished due dates, archived cards and the lists your team treats as done. cards with no member get their own spot in dusk chat.

pixel art: a purple pixel bot and a sky blue pixel bot beside the trello mark on a white tile, an alarm clock and a calendar and a signpost, on a sandy path in front of chalk cliffs by the sea, one saying "who can unblock this"

the message

paste this into a chat with your bot

every weekday at 9:15am, read the open lists and open cards on my trello board at https://trello.com/b/n7w3p8kc. the finished lists are "packed" and "collected". take cards with a due time before this run and an incomplete due date. exclude archived cards and lists, and skip the finished lists.

return the card title and link, list, due time and card members here. put cards without members first, then the rest by earliest due time. don't choose a lead when several members share a card.

never move a card, change a deadline or mark work complete. if the board read cuts off, tell me. otherwise stay quiet when nothing qualifies.
when
weekdays at 9:15am, with overdue measured at run time in your team’s time zone
needs
trello read only, the board link, its list names and card fields including due status and members. replace the board link and finished list names with yours.

what comes back

an example, not a real run

unassigned · print collection slips · packing · due mon 16:00 · trello.com/c/m7k2p4az
felix wood · proof the care label · artwork · due tue 17:00 · trello.com/c/v5h8n2bx

make it yours

  • allow a grace period. change “before this run” to “at least one full day late” for a board with flexible deadlines.
  • name every finished list. include lists like “handed to courier” if the team considers its job done there.
  • keep the meeting short. show the earliest overdue card per list and give the count of other late cards behind it.

when it goes wrong

  • a finished card sticks around. the team may move it without marking its due date complete. compare the list name with the routine’s exclusions.
  • tomorrow’s work shows up today. ask for the full due time and time zone. compare timestamps before shortening them for the digest.
  • the list misses an old card. reading only recently edited cards drops untouched work. use the board’s open cards without a recent-activity cutoff.1

a late card is a question for the meeting

ask what the card needs before changing its date. the link lets someone open the brief while the team is together. an unassigned card might need a volunteer. a late proof might need a decision from the person who requested it.

if your board barely uses due dates, dusk bot will miss most of your stuck work here. review the active list together instead.

questions

do cards due later today show up?

they stay off the list until the due time passes. if you want advance notice, add a separate “due before tomorrow’s standup” group.

does it include overdue items inside a card’s checklist?

this routine uses the card’s own due date. it doesn’t inspect checklist items. give work its own dated card if you want it discussed here.

sources

  1. composio: trello actions, checked 20 november 2026
  2. dusk bot docs: routines
  3. dusk bot docs: connected apps

drafted with ai help from the dusk bot docs and the sources listed on this page, then checked against them. if something here is wrong or out of date, write to [email protected].